High Rise Projects

Meales Concrete Pumping Hgh Rise provide high quality concrete placement services to projects throughout Australia.  The following are just a few projects that we have completed or are currently working on.
To view a comprehensive list of High Rise Projects completed or in progress click here

Grand Central Shopping Centre

  In 2015 Meales Concrete Pumping was awarded the concrete pumping package for the $300 million Grand Central Shopping Centre in Toowoomba.

The Largest Shopping Centre in Toowoomba is underway with 60M and 40M Mobile permanantly on site.

Placing Booms from 32 to 43M will be errected over the duration of the project to see over 40,000 Square metres of concrete be pumped.

Concrete on this project is expected to be completed by Early 2017.

Grand Central Shopping Centre
Contractor: Pro Build
Duration: 2015 –2017

 
 
Queensland Childrens Hospital

  In 2010 Melaes Concrete Pumping was awarded the concrete pumping package for the $890 million Queensland Children’s Hospital (QCH) currently under construction by Abi Group.

With construction and concrete commenced in August 2010 the 4 levels of underground carpark  is nearing completion with 12 levels of state of the art hospital soon to commence.

Like many large scale projects in built up areas this site was presented with many access problems and therefore required careful planning between the contractor and ourselves to be able to successfully execute the concrete pumping program on time and on budget.

Limited space for so many concrete trucks resulted in a concrete pumping lay down area being established across the other side of Stanley St, 150m away from the site.

With the use of 2 high pressure trailer pumps (Putzmeister 2110 and Schwing 4000) concrete is conveyed underground via 4 static lines to service six placing booms (Putzmeister MX36 and Schwing KVM 39m, 2 x KVM 32m and 2 x DVM 32m SPB’s).

Concrete on this project is expected to be completed by Late 2012.

Queensland Childrens Hospital
Contractor: Abi Group
Duration: 20010 –2012

 
 
Brisbane Supreme Court

Located on Roma St, Brisbane the new supreme court will boast to be the most expensive courthouse in Australia with a project value in excess of $500 million
Meales Concrete Pumping commenced pumping in April 2009, with expected completion on September 2011.
There is approximately 40,000m3 to be pumped
The project will begin with a Schwing DVMK50 mounted at Basement 3 on Leibherr towers.
2 x KVM28's were installed on podium to complete the podium pours. with a Schwing 4000 set on the street. 
3 x Schwing KVM32/28 metre placing booms were mounted on 3 separate jump systems to pour all typical levels though complications with the Jump design forced the dismantle of the KVM32's and saw the DVMK50 moved to the centre of the project standing on 13 towers and climbed 4 Times.
the majority of the site will be pumped by 2 Electric pumps with a motor capacity of 160kw.

Equipment Used  

  • DVMK50 Placing Boom
  • 3 x 32m KVM Schwing Placing Booms  
  • 2 x 28m KVM Schwing Placing Booms
  • 2 x Schwing 3000 Electric Skid Pumps
  • 1 x Schwing 4000 Skid Pump  
  • 1 x Schwing 3000 Skid Pump
  • 1 x BP1500 Skid pump for Blockfill
  • Various Mobile Pumps

Brisbane Supreme Court
Contractor:Lend Lease

Duration: 2009 - Sept 2011

 
 
Mackay Base Hospital

The $408 million redevelopment of Mackay Base Hospital is part of a major expansion of health services for the north Queensland community which is being undertaken by Baulderstones. 

The redeveloped hospital, covering almost 40,000 square metres, is being designed to meet the projected growth in demand for health services.The project is being delivered in three stages with stage one commenced in February 2010 and completion of all stages by December 2013.

These works are being carried out with a joint venture between Brisbane and Meales Mackay branches. Several components of the project are being serviced by mobile pumps while the main core of the building is being covered by a large separate placing boom and high pressure trailer pump

Mackay Base Hospital
Contractor: Baulderstone

Duration: 2011 –2013

 
 
Yungaba Kangaroo Point

Austrlands controversial project will be developed on Brisbane's historic Yungaba House site, which was the first property to be put on the state's heritage register in 1992. The State government sold the site to Australand.

The project will include 68 units in the first stage, and ten luxury homes in the second stage, which will be built into the historic riverfront home.

Further stages will sell an approximate 90 more apartments, bringing the total to 167 dwellings

Equipment Used  

  • 2 x 28m KVM Schwing Placing Booms  
  • 1 x Schwing 3500 Skid Pump 

Australand Yungaba Kangaroo point
Contractor: Australand

Duration: 2011 – 2012

 
 
The Oracle Broadbeach

Job Type : Holiday Apartments             
Building Type : Basements 4 levels               
2 Towers (one 40 story, one 50 story)          
Approx Concrete : 65 000 cubic meters                 
Equipment Used : Large long reach boom pumps for basement area   

Equipment Used  

  • 2 x 32m KVM Schwing Placing Booms  
  • 1 x Schwing 4000 Skid Pump  
  • 1 x Putzmeister 2110 Skid Pump 

Oracle
Contractor: Grocon

Duration: 2008 – 2010

 
 
400 George Street Brisbane

Job Type : Holiday Apartments             
Building Type : Basements 4 levels               
35 Levels          
Approx Concrete : 30, 000 cubic meters                 

Equipment Used  

  • 1 x KVM 31/27 Schwing Placing Boom
  • 1x KVM 26/22  Schwing Placing Boom 
  • 1 x Schwing BP300 Electric Skid Pump

400 George
Contractor: Thiess

Duration: 2007-2009

 
 
Northbridge Tank St Brisbane

Job Type : Accomodation Apartments             
Building Type : Basements 4 levels               
29 Level Building          
Approx Concrete : 25 000 cubic meters                 

Equipment Used  

  • 1 x KVM39/35 Seperate Placing Boom  
  • 1 x Schwing BP3500 Skid Pump  

Northbridge
Contractor: Hutchinson Builders
Duration: 2007 – 2008

 
 
Little Cribb Street Brisbane

Job Type : Building             
Building Type : 13 Level Office Building         
Approx Concrete : 65 000 cubic meters                 

Equipment Used  

  • 1 x DVM32 Seperate Placing Boom
  • 1x Schwing BP 3000 Skid Pump

CB04 Little Cribb Street
Contractor: Adco Constructions

Duration: 2008 –2009

 
 
 